“SHELTER” OBJECT SAFETY STATUS REPORT. Volume 1.
“SHELTER” OBJECT SAFETY STATUS REPORT. Volume 2.


| On November 29, 2016, the installation of the NSC Arch into the design position over the Object Shelter was completed |
| 30 November, 1996 – Unit 1 was finally shutdown |