Re-equipment of the radiation dosimetric control system in the Chornobyl Exclusion Zone and at the Chornobyl NPP

Project title: Р799 Re-equipment of the radiation dosimetric control system in the Chornobyl Exclusion Zone and at the Chornobyl NPP

Funding: US Department of State

Objective: Co-financing of the re-equipment of the radiation dosimetric control system in accordance with the technical specifications developed under the EU-funded Project U4.01/18B Phase 1 “Modernization of the dosimetric control system in the Chornobyl Exclusion Zone and environmental (radiation) monitoring at the Vektor Complex and Buryakivka Waste Disposal Site - U4.01/18B”.

Expected Outcome: Improving radiation safety in the Chornobyl Exclusion Zone by re-equipping the radiation dosimetric control system of the Chornobyl Exclusion Zone and ChNPP.

Nearest Events

November 17, 2001 ChNPP was assigned as the operating organization (operator) of Chornobyl NPP’s nuclear installations
On November 29, 2016, the installation of the NSC Arch into the design position over the Object Shelter was completed