• UA

    • Home
    • About
      • History of the ChNPP
        • Construction and Operation
        • Accident and its Elimination
        • Post-accident operation and shutdown
        • The full-scale war of russia against Ukraine
      • ChNPP Structure
    • Infocenter
      • News
      • Photos
      • Unofficial
      • Literature
    • Activity
      • ChNPP Decommissioning
      • Shelter object transformation
        • New Safe Confinement
      • Radioactive Material Management
        • Radioactive Waste Management
        • Spent Nuclear Fuel Management
      • International Technical Assistance Projects
      • ICCA Procurement
    • Contacts
    • Partners
    • Visit Chnpp
      • Technical visits and Mass media
      • Information Visits
    1. Infocenter
    2. News
    16 July 2020

    State Nuclear Regulatory Inspectorate: Inspection of ChNPP

    • Print
    • Email

    During July 14-17, the State Nuclear Regulatory Inspectorate of Ukraine (SNRIU) is inspecting the Chornobyl NPP. The inspection goal is to check whether SSE ChNPP could perform pilot operation of Commissioning Stage 1 of the New Safe Confinement meeting the requirements of nuclear and radiation safety.

    The Commissioning Stage 1 of the New Safe Confinement (NSC CS-1) is a complex of facilities designed and constructed by the General Contractor of the NSC Project, i.e. NOVARKA Company. It includes metal structures of the Arch together with the main crane system, and the systems of life-support and state control of NSC, as well as new ventilation stack.

    The SNRIU Commission is headed by Mrs. Tamara Sushko, Deputy Chairperson of the Radioactive Waste Management Safety Department.

    “This inspection is related to the fact that Chornobyl NPP submitted an application and a package of documents to obtain a specific permission for pilot operation of NSC CS-1.

    Read more ...

    10 July 2020

    Press-release on the incident which took place at ChNPP on 09 July 2020

    • Print
    • Email

    On 09 July 2020, the current transformer of the 330 kV Outdoor Switchyard ceased to operate which was followed by the inflammation which took place at 23 h 56 min.

    The fire was extinguished at 01 h 35 min.

    The auxiliary power supply system of the plant has worked in the design mode starting the diesel generator.

    No change to the radiation situation at ChNPP site has been observed in the aftermath of the fire. The event is not subject to classification according to the Rules on investigating and accounting incidents at a nuclear power plant.

    Read more ...

    09 July 2020

    The Donor Assembly of the Nuclear Safety Account marked progress in implementation of projects at ChNPP industrial site

    • Print
    • Email

    An annual meeting of the Nuclear Safety Account’s Assembly in online-conference mode was held on 7th of July, 2020. The Ukrainian delegation took part in this meeting including representatives of the Cabinet of Ministers of Ukraine, Ministry of the Environmental Protection and Natural Resources of Ukraine, State Agency of Ukraine on Exclusion Zone Management, State Nuclear Regulatory Inspectorate of Ukraine, SSE “Chornobyl NPP” and other members of the government delegation.

    Information about work progress on the international projects having being implemented at the ChNPP industrial site, i.e. Interim Spent Fuel Dry Storage Facility (ISF-2) and New Safe Confinement (NSC), was presented at the meeting.

    Read more ...

    09 July 2020

    Information about COVID-19 disease incidence at SSE ChNPP

    • Print
    • Email

    Based on information of the Slavutych City Hospital’s Administration, as of 08 July 2020, there are no confirmed cases of COVID-19 respiratory disease among ChNPP employees.

    One employee with the confirmed case of COVID-19 (as of 23 June 2020) was discharged after recovery.

    The disease was not detected among the contact persons. The analyses of polymerase chain reaction are negative.

    06 July 2020

    The “Ukraine – EBRD” Joint Committee notes good progress in the implementation of international projects at the Chornobyl NPP site

    • Print
    • Email

    The "Ukraine - European Bank for Reconstruction and Development” Joint Committee meeting which was held at the House of Government in videoconference mode, with participation of the Vice-Prime-Minister of Ukraine for European and Euroatlantic Integration Olha Stefanishina, EBRD’s Vice-President for Policy and Partnership Pierre Heilbronn, the Minister of Environment and Natural

    Resources of Ukraine Roman Abramovskyi, the Head of the State Agency of Ukraine for Exclusion Zone Management Sergii Kalashnyk, and authorized representatives of government bodies, has noted good progress in the implementation of international projects at the ChNPP industrial site.

    The parties noted that significant progress in implementing international projects has been achieved due to the stable institutional environment brought about by the Ukrainian side, and close cooperation with the EBRD..

     

    Read more ...

    1. Environmental Initiative at ChNPP
    2. The suspected case of COVID-19 at ChNPP was not confirmed
    3. Information about a suspected case of COVID-19 respiratory disease at ChNPP
    4. ChNPP withdraws from the quarantine

    Page 41 of 116

    • Start
    • «
    • 36
    • 37
    • 38
    • 39
    • 40
    • 41
    • 42
    • 43
    • 44
    • 45
    • »
    • End
    Copyright © 2025 Чорнобильська АЕС. All Rights Reserved.
    Joomla! is Free Software released under the GNU General Public License.
    • Home
    • About
      • History of the ChNPP
        • Construction and Operation
        • Accident and its Elimination
        • Post-accident operation and shutdown
        • The full-scale war of russia against Ukraine
      • ChNPP Structure
    • Infocenter
      • News
      • Photos
      • Unofficial
      • Literature
    • Activity
      • ChNPP Decommissioning
      • Shelter object transformation
        • New Safe Confinement
      • Radioactive Material Management
        • Radioactive Waste Management
        • Spent Nuclear Fuel Management
      • International Technical Assistance Projects
      • ICCA Procurement
        • Повідомити про корупцію
      • План діяльності системи енергетичного менеджменту
    • Contacts
    • Partners
    • Visit Chnpp
      • Technical visits and Mass media
      • Information Visits
      • Культура захищеності