• UA

    • Home
    • About
      • History of the ChNPP
        • Construction and Operation
        • Accident and its Elimination
        • Post-accident operation and shutdown
        • The full-scale war of russia against Ukraine
      • ChNPP Structure
    • Infocenter
      • News
      • Photos
      • Unofficial
      • Literature
    • Activity
      • ChNPP Decommissioning
      • Shelter object transformation
        • New Safe Confinement
      • Radioactive Material Management
        • Radioactive Waste Management
        • Spent Nuclear Fuel Management
      • International Technical Assistance Projects
      • ICCA Procurement
    • Contacts
    • Partners
    • Visit Chnpp
      • Technical visits and Mass media
      • Information Visits
    1. Infocenter
    2. News
    18 May 2018

    World Association of Nuclear Operators mission is underway at Chernobyl Nuclear Power Plant

    • Print
    • Email

    During the week, from May 14 to May 18, the technical support mission of the World Association of Nuclear Operators (hereinafter: WANO) devoted to review the methodology and practice for the nuclide vectors identification was held at Chernobyl NPP.

    The timeliness of the topic discussed within the mission is caused by presence of difficult-to-measure radionuclides in the radioactive waste (hereinafter: RAW) of Chernobyl NPP. ChNPP intends to assess their activity by combining the measurement of the key radionuclides activity directly and calculation of the difficult-to-measure radionuclides activity using a predetermined scaling factor, that is, by the nuclide vector method.

    This topic is important for ChNPP in two aspects. The first aspect is related to the commissioning of the Industrial Complex for Solid Radioactive Waste Management (hereinafter: ICSRM). The problem was identified in 2015 during the Phase II of ICSRM commissioning. Based on the testing results it was revealed that the activity of a number of nuclides, in particular, U, Pu, Am, is assessed incorrectly by the existing radiation and technological control system, and, as a result, that doesn’t allow to draw up the corresponding passport for the Radioactive Waste package.

    Read more ...

    08 May 2018

    First 12 dogs brought out from New Safe Confinement site

    • Print
    • Email

    On April 27, the workers from Clean Futures Fund, Chernobyl NPP and NOVARKA company have brought out 12 puppies from the New Safe Confinement construction site.

    The process is taken place under 5-year project “Chernobyl Dogs” for sterilization and vaccination of dogs from Chernobyl Exclusion Zone started in 2017. The project goal is to reduce animal population naturally by means of sterilizing them, therefore, to create safer conditions for the employees of Chernobyl NPP and Exclusion Zone.

    The Clean Futures Fund Co-founder Lucas Hixson comments the process of dog transportation: “We finally got permission to start rescuing some of the puppies from the Chernobyl Nuclear Power Plant and bring them back to America for adoption and to go to forever homes. Today we are going to bring 12 dogs out of local zone. In total we would like to see up to 200 adopted dogs”.

    “The dogs are going to go through dosimetry check, then get washed. We are going to take them to Slavutych, where we have established puppies sanctuary at the hippodrome. They are going to stay there for the next 45 days.

    We have special trainers that will be working with them every day. On the weekends people will be able to come and play with the puppies at the hippodrome. Everything is ready for this. Then in June these dogs will fly back with us to the USA and we will bring them to the families that are adopting them”, Mr. Hixson shares his plans.

    Read more ...

    26 April 2018

    President of Ukraine visited the Chernobyl NPP

    • Print
    • Email

    On 26th April President of Ukraine Petro Poroshenko visited the Chernobyl NPP site. The visit was made within the scope of events dedicated to the 32nd anniversary of the ChNPP accident.

    The first facility visited by the President was an Interim Spent Fuel Dry Storage Facility (hereinafter – ISF-2). This facility is designed for the acceptance, processing and directly storage of spent fuel assemblies (nuclear fuel) accumulated at the Chernobyl NPP during its operational period. Currently all basic technological equipment has been installed in the storage facility and “cold” tests are underway.

    At the ISF-2 ChNPP Director General Igor Gramotkin and Safety Improvement Chief Engineer Andrii Savin briefed the President on the work progress.

    Following visiting the ISF-2 Petro Poroshenko put flowers to the monument to the Heroes of Chornobyl and presented state awards to the accident liquidators – the ChNPP employees. In his speech the President noted: “Just now I have examined the state of readiness of the Interim Spent Fuel Dry Storage Facility and only the principled position of the operators, under the strict directives of the Government, ensures the guaranteed quality and safety of operation of this crucial facility in the future.”

    Read more ...

    24 April 2018

    Press Announcement

    • Print
    • Email

    Events dedicated to 32nd anniversary of the Chornobyl catastrophe with the participation of first persons of the country, SAUEZM’s and ChNPP’s management and representatives of the Exclusion Zone’s enterprises will be held within the territory of the Exclusion Zone and Chernobyl NPP’s industrial site.

    Accreditation of the media representatives is valid until 25.04.2018, 14:00.

    Allowed number of the media representatives from one organization:
    - from a print media or news agency – one journalist and one camera reporter;
    - from a TV-channel – two persons (a journalist and a camera man).

    Read more ...

    23 April 2018

    Visit of the Verkhovna Rada Committee

    • Print
    • Email

    An offsite meeting of the working group of the Committee on Environmental Policy, Natural Resources and Mitigation of the Chernobyl Accident Consequences of the Verkhovna Rada of Ukraine was held today at the Chernobyl NPP. The visit took place in accordance with the work plan of the Committee in the framework of the Eight session of the Verkhovna Rada. Deputies set an objective to study the issues related to commissioning of the New Safe Confinement and other facilities of the Exclusion Zone.

    Representatives of the deputy corps visited the site under the arch of the New Safe Confinement and the construction site of Interim Storage Facility No.2, and familiarized themselves in detail with the progress of the projects. During the visit, a working meeting was held with the participation of the members of the Committee, the ChNPP administration and Chairman of the State Agency of Ukraine on Exclusion Zone Management.

    1. Press Tour at the NPP
    2. Adoption in the first reading of the Law "On Amendments to the National Program on Decommissioning of the Chernobyl NPP and Transformation of the Shelter Object into an Environmentally Safe System"
    3. Liquid RAW Treatment Plant is ready for operation
    4. Accounting Chamber of Ukraine considers the internal environment created at ChNPP to be reliable

    Page 62 of 116

    • Start
    • «
    • 57
    • 58
    • 59
    • 60
    • 61
    • 62
    • 63
    • 64
    • 65
    • 66
    • »
    • End
    Copyright © 2025 Чорнобильська АЕС. All Rights Reserved.
    Joomla! is Free Software released under the GNU General Public License.
    • Home
    • About
      • History of the ChNPP
        • Construction and Operation
        • Accident and its Elimination
        • Post-accident operation and shutdown
        • The full-scale war of russia against Ukraine
      • ChNPP Structure
    • Infocenter
      • News
      • Photos
      • Unofficial
      • Literature
    • Activity
      • ChNPP Decommissioning
      • Shelter object transformation
        • New Safe Confinement
      • Radioactive Material Management
        • Radioactive Waste Management
        • Spent Nuclear Fuel Management
      • International Technical Assistance Projects
      • ICCA Procurement
        • Повідомити про корупцію
      • План діяльності системи енергетичного менеджменту
    • Contacts
    • Partners
    • Visit Chnpp
      • Technical visits and Mass media
      • Information Visits
      • Культура захищеності