180°
|
ChNPP Units after sliding of New Safe Confinement’s Arch (2017) |
|
|
Interim Spent Nuclear Fuel Dry-type Storage Facility (ISF-2) (2016) |
|
|
Outdoor switchyard and NSC from bypass channel’s bridge (2014) |
360°


| On November 29, 2016, the installation of the NSC Arch into the design position over the Object Shelter was completed |
| 30 November, 1996 – Unit 1 was finally shutdown |